The steam boiler is equipped with two water pumps, running and standby.
The boiler is equipped with one or two plate type water level gauges, which should be compared with each other frequently. If the indication is found to be inconsistent, it must be corrected immediately. The water level gauge should be flushed every shift to determine its true water level. At the same time, it is also equipped with an electrode point water level balance cylinder, which can accurately collect water level signals to send out an alarm or perform feedwater pump control.











